Heavy Rains Disrupt Electricity and Rail Services Across Tanzania
Dar es Salaam – Heavy rains in several parts of Tanzania have disrupted electricity supplies and rail services across the country.
The Ministry of Transport issued a statement on Sunday, December 28, 2025, confirming the disruptions following warnings from the Tanzania Meteorological Authority (TMA) of heavy rainfall accompanied by strong winds in numerous regions.
According to the ministry, the downpours have damaged sections of the old metre gauge railway (MGR), including bridges at Kidete in Kilosa District, Morogoro Region, and Gulwe in Mpwapwa District, Dodoma Region.
Power faults affecting both the Tanzania Electric Supply Company (Tanesco) and the Standard Gauge Railway (SGR) electricity system have also been reported, leading to interruptions in rail services.
Road transport has likewise been affected, with landslides and mud accumulation reported along the Morogoro–Iringa highway, particularly on the stretch between Mama Marashi and Mikumi, posing risks to motorists on the busy corridor.
The government has urged the public to take precautions, avoid travel in affected areas where possible, follow official updates and comply with instructions from security and transport authorities.
Emergency repair works are under way to restore damaged infrastructure and ensure safety before normal operations resume. The ministry is urging travellers to remain patient as rehabilitation efforts continue.